Registration must be done within 30 days of the day you closed on your home. Use the closing date as the installation date. You will need to find the unit model and serial numbers (this can be found on the sticker on the side of each piece of equipment) If your system is a heat pump, there will be 2 pieces of equipment (the air handler and the outside heat pump) if the system is a furnace/ ac, there will be 3 pieces of equipment (the furnace, evaporator coil and the outside air conditioner).

To keep all warranties validated you must keep your system maintained by a licenses HVAC provider.

For Carrier systems

For Lennox Systems

For Goodman systems

Services Offered:

  • Air Conditioning Installation
  • Air Conditioning Repair
  • Heating Installation
  • Heating Repair